Monday, October 24, 2011

** Pathway from Lot 4 to KCI will be closed on the 25th. **


Thanks to Paul for the following:

There's a sign posted outside the KCI facing Parking Lot 4 that says,
"This pathway to the KCI building will be closed all day next Tuesday Oct. 25 for paving. Please use the KCI temporary pathway from Lot #3."
Below that is a map showing the gravel path leading from Parking Lot 3 at the bottom of the hill up to the KCI.

No comments: